This story from the April 2019 edition of Australian Aviation looks at the global trends in maintenance, repair and overhaul (MRO) in an Australian context.
The ATSB has recommended EASA and ATR improve the ATR's system design tolerance to inadvertent dual control inputs in response to a Virgin incident in 2014.
The Federal Aviation Administration (FAA) says there is no timetable for certifying the Boeing 737 MAX for a return to service.
The European Union Aviation Safety Agency has "pre-conditions" that need to be met before the Boeing 737 MAX returns to service, news reports say.
Airbus will offer 450nm more range and lift the maximum takeoff weight by 2.3t on its two-aircraft A220 regional jet program from the second half of 2020.
BAE Systems Australia will set up a new laboratory to develop high frequency (HF) radar technologies for Australia’s Jindalee Over the Horizon Radar system.