Bankstown granted masterplan extension until 2013

written by australianaviation.com.au | March 31, 2011

Bankstown Airport from the air. (Paul Sadler)

Sydney Metro Airport Bankstown has announced that it has gained approval from Federal Minister for Transport Anthony Albanese to lodge a new revised draft masterplan by February 15 2013, as the airport looks to assess the impact of future developments in the Sydney Basin.

The announcement follows on from Albanese’s initial rejection of Bankstown Airport’s 2010 draft masterplan. This led the airport to request lodging a revised draft masterplan in two years, according to Sydney Metro Airport Bankstown CEO Colin Grove. “There were several reasons why we sought a longer extension period, one of the most important being the impact the future release of the Sydney Basin Aviation Capacity Study may have on the final contents of the revised Bankstown Airport draft masterplan, particularly in respect of any future passenger services. Therefore, we believe it is imperative that the results of the study need to be considered in the revised document to be submitted to the Minister for approval,” Grove said.

This content is available exclusively to Australian Aviation members.
Login
Become a Member
To continue reading the rest of this article, please login.

or

To unlock all Australian Aviation magazine content and again unlimited access to our daily news and features, become a member today!
A monthly membership is only $5.99 or save with our annual plans.
PRINT
$49.95 for 1 year Become a Member
See benefits
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
PRINT + DIGITAL
$99.95 for 1 year Become a Member
$179.95 for 2 years Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin
DIGITAL
$5.99 Monthly Become a Member
$59.95 Annual Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin

“Also the airport needs significant time to prepare revised Australian Noise Exposure Forecasts (ANEF) which will require third party regulatory endorsement and there may also be a need to include an airspace management study.

“As the process is quite extensive planning has already commenced for the preparation of the preliminary version of the draft masterplan.”

Grove said that while the 2013 plan was in development, the current 2005 Master Plan remains in force as an interim measure.

 
 

“This document supplies guidelines for matters relating to land use, aviation capacity, environment, noise forecasts, passenger services, surface transport, runway extensions and many other regulatory issues.

“We will notify the community and interested stakeholders in the coming months of the consultation schedule,” concluded Grove.

Want to see more stories from trusted news sources?
Make Australian Aviation a preferred news source on Google.
Click here to add Australian Aviation as a preferred news source.

You need to be a member to post comments. Become a member today!

Comments (4)

  • Jon

    says:

    Bankstown is acknowledged by very experienced pilots as a very dangerous port and yet it is planned to expand it in the heart of suburban Sydney! What kind of lunatic thinking is that? At the very minimum there should be a curfew at the airport akin to that required of heavy industry near residential areas. If I were an aviation business manager I would be consulting my conscience as well as my other business factors before making a decision relating to locating at Bankstown…its past its ‘use by’ date…and more and more people are waking up to that.

  • KERRY GNADEN

    says:

    Here we go again. BAL don’t get it at all do they. Their airport management plan was rejected, yet they still want to go down the path of introducing RPT services in their 2013 plan. They want other factors such as the Sydney basin aviation capacity study to justify RPT services into a suburban airport. BAL just don’t seem to understand that people don’t want this type of expansion at the airport, and lets face it, nothing will happen in the next two years to the airport to support the proposed RPT services. The most likely thing will be that BAL will go broke in the meantime, and the airport will come under government control again. Can’t wait!

  • dev

    says:

    It’s hard to believe that Hoxton Park could not be made more profitable considering it was right next to an arterial highway in the middle of an industrial area. Also that PA31 that crashed in Canley vale last year, would probably not have been fatal has Hoxton still been available. The road networks surrounding Bankstown are not suited to freight like the M7 is. I believe that Paul Phelan has asserted in Australian flying numerous times that this whole thing goes back to the mistake of privatising a piece of public infrastructure that the general community simply does not understand how large and subtle the impact is on the community are. I’ve got to agree. Melbourne has Essendon, Brisbane has Maroochydore. Sydney needs an equivalent as well as Bankstown and Camden because neither of these will ever really be suitable thanks to their unfortunate geography.

  • Ryan Pelquest-Hunt

    says:

    If Bankstown is planning development for passenger carrying services where will all the GA go??

Comments are closed.

Momentum Media Logo
Most Innovative Company
Copyright © 2007-2026 MOMENTUMMEDIA