Close sidebar

First Rate-10 787 rolled out

written by australianaviation.com.au | January 25, 2014
A 787-8 for Aeromexico is the first Rate 10 787 off the line. (Boeing)
A 787-8 for Aeromexico is the first Rate 10 787 off the line. (Boeing)

The first Boeing 787 produced at the rate of 10 aircraft per month has rolled out of the company’s Everett, Washington facility.

The aircraft – a 787-8 destined for Aeromexico via lessor ILFC – is the 155th 787 manufactured. Boeing says the build rate is the highest ever for a wide bodied airliner, and represents the third production rate increase since November 2012.

“This rate increase reflects the continued strong demand for the 787,” Larry Loftis, vice president and general manager, 787 program said in a statement. “A disciplined approach that combined employee teamwork with technology was key to achieving the higher rate.”

Advertisement
Advertisement

But questions remain over whether the new rate is sustainable, with the Wall Street Journal reporting that Boeing is looking to re-hire contract engineers at its Charleston, South Carolina assembly line to address re-work issues at that facility.

The report says that, while many of the contractors were laid off just 12 months ago as the manufacturer sought to reduce costs on the program, the line is experiencing numerous rework issues that will require up to 300 more workers to address.

Steer your own in-flight experience – available on print and digital Whether our classic glossy magazine in your letterbox, daily news updates in your inbox, peeling back a few layers in the podcast or our monthly current affair reports, you can count on us to keep you up to date. Sign up today for just $99.95 for more exclusive offers here. Subscribe now at australianaviation.com.au.

First Rate-10 787 rolled out Comment

  • Glen

    says:

    This story shows just how short sighted Boeing is hiring and firing skilled workers like these is just crazy . I hope a lot of them have got jobs elsewhere . Maybe Boeing should reduce the number of managers instead of firing engineers if they want to save money. Of course the 787 have been so badly managed from the start a good sign that there just too many chiefs at Boeing.

Leave a Comment

Your email address will not be published. Required fields are marked *

First Rate-10 787 rolled out

written by australianaviation.com.au | January 25, 2014
A 787-8 for Aeromexico is the first Rate 10 787 off the line. (Boeing)
A 787-8 for Aeromexico is the first Rate 10 787 off the line. (Boeing)

The first Boeing 787 produced at the rate of 10 aircraft per month has rolled out of the company’s Everett, Washington facility.

The aircraft – a 787-8 destined for Aeromexico via lessor ILFC – is the 155th 787 manufactured. Boeing says the build rate is the highest ever for a wide bodied airliner, and represents the third production rate increase since November 2012.

“This rate increase reflects the continued strong demand for the 787,” Larry Loftis, vice president and general manager, 787 program said in a statement. “A disciplined approach that combined employee teamwork with technology was key to achieving the higher rate.”

Advertisement
Advertisement

But questions remain over whether the new rate is sustainable, with the Wall Street Journal reporting that Boeing is looking to re-hire contract engineers at its Charleston, South Carolina assembly line to address re-work issues at that facility.

The report says that, while many of the contractors were laid off just 12 months ago as the manufacturer sought to reduce costs on the program, the line is experiencing numerous rework issues that will require up to 300 more workers to address.

Steer your own in-flight experience – available on print and digital Whether our classic glossy magazine in your letterbox, daily news updates in your inbox, peeling back a few layers in the podcast or our monthly current affair reports, you can count on us to keep you up to date. Sign up today for just $99.95 for more exclusive offers here. Subscribe now at australianaviation.com.au.

First Rate-10 787 rolled out Comment

  • Glen

    says:

    This story shows just how short sighted Boeing is hiring and firing skilled workers like these is just crazy . I hope a lot of them have got jobs elsewhere . Maybe Boeing should reduce the number of managers instead of firing engineers if they want to save money. Of course the 787 have been so badly managed from the start a good sign that there just too many chiefs at Boeing.

Leave a Comment

Your email address will not be published. Required fields are marked *

Each day, our subscribers are more informed with the right information.

SIGN UP to the Australian Aviation magazine for high-quality news and features for just $99.95 per year