Harrier, Nimrod and F-35B axed in huge UK defence cuts

written by australianaviation.com.au | October 20, 2010

The Nimrod MRA4 has been axed. (UK MoD)

The UK’s Cameron coalition government has announced plans to cut huge numbers of personnel and inventory under its Strategic Defence and Security Review (SDSR), with defence spending to fall eight per cent over four years.

Capabilities to be cut include the entire Harrier force from 2011 and the carrier HMS Ark Royal immediately, which means the UK won’t be able to operate fixed wing aircraft off its own carrier until 2019, and the yet to enter service BAE Nimrod MRA4 maritime reconnaissance aircraft. Started in 1996, the £3.2bn (A$5.2bn) MRA4 project was originally to have been for 21 remanufactured aircraft to enter service by 2004, but cost increases and schedule delays had seen that number slashed to just nine to enter service in 2012.

This content is available exclusively to Australian Aviation members.
Login
Become a Member
To continue reading the rest of this article, please login.

or

To unlock all Australian Aviation magazine content and again unlimited access to our daily news and features, become a member today!
A monthly membership is only $5.99 or save with our annual plans.
PRINT
$49.95 for 1 year Become a Member
See benefits
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
PRINT + DIGITAL
$99.95 for 1 year Become a Member
$179.95 for 2 years Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin
DIGITAL
$5.99 Monthly Become a Member
$59.95 Annual Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin

Also to be chopped is the plan to acquire up to 138 F-35B STOVL versions of the F-35 JSF, with a smaller but as yet undefined number of the F-35C carrier variant, possibly as few as 36, will be acquired instead. Construction of the two new QEII class aircraft carriers will be slowed, with at least one of the vessels to be equipped with conventional catapults and arrestor gear to cater for the F-35Cs, and the other to be placed in “extended readiness”.

Plans to increase the RAF’s CH-47 Chinook fleet by 36 aircraft have been reduced to just 12 more new aircraft, while a prior commitment to upgrade the Puma helicopter fleet has been retained.

The SDSR also calls for the RAF’s C-130J (C.4) transport and the Raytheon R.1 Sentinel ISR fleets to be retired earlier than planned, for 22 A400M transports to be acquired, and for the 14 A330 based FSTA refuelling tankers on order to be retained. Also safe are the planned Navy and Army Lynx Wildcat helicopters, and the RAF’s Tornado GR.4 strike aircraft, although Tornado numbers are under review.

 
 

Some 42,000 jobs will be shed, comprising 25,000 civilian staff and 5000 uniformed personnel each from the RAF and RN, and 7000 from the Army. Tank numbers will be cut by 40 per cent and heavy artillery by 35 per cent, and the Navy’s frigate and destroyer fleet will shrink from 23 to 19.

Want to see more stories from trusted news sources?
Make Australian Aviation a preferred news source on Google.
Click here to add Australian Aviation as a preferred news source.

You need to be a member to post comments. Become a member today!

Comments (5)

  • Lilly

    says:

    Just about time for another Falklands episode to erupt somewhere

  • Martin

    says:

    Article indicates: “Construction of the two new QEII class aircraft carriers will be slowed, with at least one … and the other to be placed in “extended readiness”.”

    Does this mean the second carrier will be built but initially just not manned / operated? Or does the term “extended readiness” in the UK now mean “several years to finish building and commissioning if it is needed for operations”?!

  • Rhettski

    says:

    A handfull of F-35Bs could be usefull on the LHDs!

  • Peter

    says:

    Its time the Comet was put to rest. There is no way embedded engines meet modern airworthiness design criteria.

  • Richard

    says:

    The GFC hangover is biting everywhere. No sector will be spared.

Comments are closed.

Momentum Media Logo
Most Innovative Company
Copyright © 2007-2026 MOMENTUMMEDIA