Close sidebar

787 ZA001 grounded by engine surge

written by australianaviation.com.au | September 16, 2010
787 ZA001

ZA001, the first Boeing 787 Dreamliner, has had to have one of its Rolls-Royce Trent 1000 engines replaced after it experienced a surge during flight testing in Roswell, New Mexico.

According to various reports, the surge occurred on September 10 late in the day while the aircraft was taxiing out for brake testing. A loud boom was reportedly heard by the operating crew, with both Boeing and Rolls-Royce stating that they understand that the surge was “an isolated event.” A replacement engine has been shipped to Roswell and is being installed on the aircraft, with the aircraft expected to return to flying by September 18.

Boeing has not yet indicated if the latest incident will have an impact on its certification and delivery schedule for the 787, with the first aircraft now expected to be delivered in the first quarter of 2011.

Advertisement
Advertisement

Steer your own in-flight experience – available on print and digital Whether our classic glossy magazine in your letterbox, daily news updates in your inbox, peeling back a few layers in the podcast or our monthly current affair reports, you can count on us to keep you up to date. Sign up today for just $99.95 for more exclusive offers here. Subscribe now at australianaviation.com.au.

787 ZA001 grounded by engine surge

written by australianaviation.com.au | September 16, 2010
787 ZA001

ZA001, the first Boeing 787 Dreamliner, has had to have one of its Rolls-Royce Trent 1000 engines replaced after it experienced a surge during flight testing in Roswell, New Mexico.

According to various reports, the surge occurred on September 10 late in the day while the aircraft was taxiing out for brake testing. A loud boom was reportedly heard by the operating crew, with both Boeing and Rolls-Royce stating that they understand that the surge was “an isolated event.” A replacement engine has been shipped to Roswell and is being installed on the aircraft, with the aircraft expected to return to flying by September 18.

Boeing has not yet indicated if the latest incident will have an impact on its certification and delivery schedule for the 787, with the first aircraft now expected to be delivered in the first quarter of 2011.

Advertisement
Advertisement

Steer your own in-flight experience – available on print and digital Whether our classic glossy magazine in your letterbox, daily news updates in your inbox, peeling back a few layers in the podcast or our monthly current affair reports, you can count on us to keep you up to date. Sign up today for just $99.95 for more exclusive offers here. Subscribe now at australianaviation.com.au.

Each day, our subscribers are more informed with the right information.

SIGN UP to the Australian Aviation magazine for high-quality news and features for just $99.95 per year