The Prime Minister and CDF at the P-8 announcement. defence

Poised for Poseidon

Government approves P-8 purchase as its first defence acquisition decision

On Friday February 21, Prime Minister Tony Abbott and Minister for Defence Senator David Johnston announced that the government had approved the acquisition of eight Boeing P-8A Poseidon aircraft.

The first aircraft is expected to be delivered in 2017 with all eight aircraft due by 2021, in order to meet the AP‑3C Orion planned withdrawal date of 2019. Additionally, the government has approved an option for a further four aircraft, “subject to the Defence White Paper review process”.

This content is available exclusively to Australian Aviation members.
Login
Become a Member
To continue reading the rest of this article, please login.

or

To unlock all Australian Aviation magazine content and again unlimited access to our daily news and features, become a member today!
A monthly membership is only $5.99 or save with our annual plans.
PRINT
$49.95 for 1 year Become a Member
See benefits
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
PRINT + DIGITAL
$99.95 for 1 year Become a Member
$179.95 for 2 years Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin
DIGITAL
$5.99 Monthly Become a Member
$59.95 Annual Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin

The acquisition has long been expected, though suffered delays due to the previous government’s project-cutting pursuit of its mythical surplus for the 2012-13 federal budget.

The acquisition itself is worthy – a long overdue partial replacement for the venerable AP-3C Orion platform, and comes despite some fairly recent criticism of the P-8’s development program from the US Department of Defense Office of Test and Evaluation, which found key “deficiencies” in P-8 mission systems.

The P-8 chapter in the Office of Test and Evaluation’s latest annual report was based on operational testing of the aircraft conducted between September 2012 and March 2013, and found problems with the aircraft’s radar performance, sensor integration and data transfer.

The report said that “many of these deficiencies” led him to determine the P-8A “is not effective for the intelligence, surveillance and reconnaissance mission, and is not effective for wide area anti-submarine search” when subject to realistic combat testing.

Despite his report claiming the aircraft is not yet ready for deployment, the US Navy deployed six P-8As to the western Pacific region at Atsugi Naval Base in Japan late last year. A January 10 statement by 7th Fleet commander VAdm Robert Thomas said the aircraft “represents a significant improvement” over the older P-3C Orion, “providing the opportunity to detect, track and report on more targets than ever before. ” In a Bloomberg report, a spokesperson for Office of Test and Evaluation boss Dr Michael Gilmore said the P-8 was effective in conducting small-area searches, similar to the P-3 it is set to replace, and the deficiencies come from ‘wide area searches’, a requirement of the P-8 development.

“P-8 was also effective in conducting ‘unarmed anti-surface warfare missions’, and its radar and supporting sensors ‘provide an effective, all-weather surface target search’,” the Bloomberg report reads. But the current strengths and identified weaknesses of the P-8 may have little impact on the government’s strategic plans for the platform.

A noteworthy aspect to the Poseidon acquisition is the distinct border security flavour of the announcement. The Abbott opposition rode into

If one was in the business of selling maritime surveillance platforms, this is the government to be pitching to.

government on its “stop the boats” campaign, and it has seemed a priority for them ever since. Maritime surveillance necessarily forms a significant part of Operation Sovereign Borders, with Australia’s AP-3C fleet heavily utilised in the search for asylum-seeker boats.

That message was only reinforced with the mid-March announcement of the government’s commitment to the MQ-4C Triton UAS – even when neither the number of Tritons expected to be acquired under AIR 7000 Phase 1B nor their planned introduction into service date were specified.

Clearly, if one was in the business of selling maritime surveillance platforms, this is the government to be pitching to.

It is also arguably significant that, despite copious criticisms of Foreign Military Sales in opposition, the Abbott/Johnston defence team has chosen the $4 billion FMS P-8 purchase to be the first project they have approved since taking government.

The acquisition of the eight aircraft will cost about $4 billion, including support facilities. Speaking after the announcement, Senator Johnston told representatives of the Australian defence industry: “When I am buying on behalf of the government and signing off at NSC on large acquisitions the questions I am asking – particularly in the aerospace area – are ‘how much of this money is coming back to Australia in terms of the supply chain? In terms of sustainment? In terms of Australian input into this acquisition?’ ” A statement from Prime Minister Abbott announcing the acquisition however said: “This project will offer significant opportunities for industry and jobs creation. ” “Australian businesses have already won approximately $8. 5 million of work associated with Australia’s participation in the P-8A program and stand to benefit by as much as $1 billion through construction of facilities at RAAF Base Edinburgh in South Australia and elsewhere, and work to meet maintenance and other support needs. ”

Want to see more stories from trusted news sources?
Make Australian Aviation a preferred news source on Google.
Click here to add Australian Aviation as a preferred news source.

You need to be a member to post comments. Become a member today!
Momentum Media Logo
Most Innovative Company
Copyright © 2007-2026 MOMENTUMMEDIA