Every sector of the aviation industry is now critically short of skilled engineers. Qantas alone is investing over $74m this year in training, $21m more than m 1988 and overall will channel over 12,000 of its people through_ one course or another during the year. Basic cause of the mternat10nal LAME shortage is the rapid growth of civil aviation these past tour year comparatively low monetary rewards, often difficult work conditions and the long time taken in becoming a fully accredited LAME compared with most other professions. Seen here is a Qantas 747 undergoing major maintenance at the Qantas jet base.

Engineering Shortage Creating Havoc

Lack of Skilled Engineers Now Becoming a Critical Problem

It would have been a courageous soothsayer indeed who would have taken the rostrum at an illustrious aviation venue in the early 1980s and began urging airlines and large GA-operators to urgently commence recruiting engineers and pilots as never before.

When the aviation, industry around the world was in the doldrums it seemed logical to adopt a keep lean policy. Why recruit pilots and engineers while suffering ailing route sectors and seemingly having too many aircraft on the books? As most readers would be well aware, all of that has changed. The alert airlines and large aviation companies sensed the upturn quickly and spurred themselves into action, taking up their options on aircraft orders and beginning massive pilot recruitment programmes. Where they were caught short, however, was in the field of maintenance-having an adequate pool of maintenance engineers. In fact, even as this article is being written, airlines and other operators are losing substantial numbers of their skilled maintenance pool, further exacerbating the problem. Indeed, it is not only Australia that is feeling the pinch.

The United States is also suffering from a critical shortage. In 1981 the FAA had 15,000 certified candidates with A&P (airframe and powerplant) licences; in 1986, despite a massive increase in hours flown, the number had decreased to 11,000. It is conservatively anticipated that over the next five years, US airlines will add 1,000 new jet aircraft to their fleets; this will result in a need for up to 10,000 new engineers.

This content is available exclusively to Australian Aviation members.
Login
Become a Member
To continue reading the rest of this article, please login.

or

To unlock all Australian Aviation magazine content and again unlimited access to our daily news and features, become a member today!
A monthly membership is only $5.99 or save with our annual plans.
PRINT
$49.95 for 1 year Become a Member
See benefits
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
PRINT + DIGITAL
$99.95 for 1 year Become a Member
$179.95 for 2 years Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin
DIGITAL
$5.99 Monthly Become a Member
$59.95 Annual Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin

The US airlines are experiencing an exhaustive recruitment process, somewhat akin to extracting gold from low grade ore. For example, during 1987 Delta screened 12,000 engineering applicants; of this number, 1,400 were considered worth interviewing. . . 350 were eventually hired. Part of the American problem, apparently, is the failure of technical institutions to keep up with the new technology, such as composite materials, high bypass fan engines and the new generation glass cockpits. It has been suggested that airlines need to invest in the technical institutions in order to bring standards up to their expectations and to put something into the area from which they take so much. In Australia the situation is slightly different. The education factor is not so critical, as licenced aeronautical maintenance engineers (LAMEs) do receive fairly comprehensive theory courses compared with their American counterparts, albeit over a greater period (with the inference that it takes a longer time to qualify and thus makes the initial decision to become an engineer less attractive). It is this long gestation from tyro to veteran that is partly contributing to the problem in Australia.

Australian Airlines was the only major carrier to maintain a full apprentice-engineer recruitment programme during the hard times of the early eighties. As a result, the airline now enjoys a situation where a good number of newly qualified engineers are now coming up to speed and able to provide useful support to more senior engineers. The question. does arise however whether the airline will be able to maintain the status quo with their current remuneration packages.

While Ansett reduced its intake programme during the recession, it has benefited more recently by enticing away a number of Qantas engineers with its offer of substantially more money. At present, it is no secret that Qantas is feeling the shortage-not to a level where standards are affected, but the airline is deeply concerned about its shortage; and certainly about how to retain its existing workforce, especially when government intervention frustrates the airline’s attempts to improve remuneration for engineers. Qantas this year is spending $74m on training alone which will involve at one time or another around 12,000 of the Company’s workforce. In fact, 8% of the airline’s manpower costs this year are being directed at training, that’s four times the national average. (Refer Alan Terrell interview this issue. ) Even the CAA is stressed to the limit in its Airworthiness division. At the beginning of this year there were only 144 airworthiness surveyors as against a requirement for 183. Furthermore 39 of these 144 are due to retire in the coming year and it is expected that this number again will probably defect to industry owing to the present low pay and morale experienced within the CAA. Most estimates put the present CAA engineer/surveyor pay structure at least $15,000 per annum below that of the airlines. (Refer Recce, p. 4) Corporate and general aviation are also, having their difficulties. Some have expressed disillusion with the investment required to train an apprentice-engineer from beginning to end only to have the candidate then defect to another camp where the grass is greener.

One corporate aviation manager expresses what he describes as a realistic view of the situation: “We’ve just recently lost three engineers. It’s disappointing when it happens, but usually comes as no great surprise. They simply don’t get paid enough for what they do in most places. It’s all out of context. It can take 14 years for an engineer to get all of his licences and really be a good operator. How long does it take a lot of other professions- a third of that time? And they end up making three times as much money. We simply have to pay them more to keep them. ” In the corporate sector, there is a growing consensus that it would be far more satisfactory to double LAMES’ salaries in order to retain a full complement of engineers and thus achieve a more rapid turnaround time in the hangar. After all, it is argued, it is cheaper to budget another $500 a day and get a job done in two days instead of two weeks – the latter due to a too thin spread of skilled engineers over too manyjobs-because to have a corporate jet on the ground could be costing $3,000 a day in lost revenue. So where do the missing engineers go? Many simply go to other companies that pay more. Some go overseas. Others leave the hangar floor and enter specialised areas such as sales, consultancies and special project work. Some further their qualifications and move into specialised areas such as avionics and simulation.

For all of the operators it would appear that there is no short-term solution apart from a monetary one. Certainly without making a LAME’s lot decidedly more attractive, the current problem will only continue to grow.

 

Want to see more stories from trusted news sources?
Make Australian Aviation a preferred news source on Google.
Click here to add Australian Aviation as a preferred news source.

You need to be a member to post comments. Become a member today!
Momentum Media Logo
Most Innovative Company
Copyright © 2007-2026 MOMENTUMMEDIA